meralco service entrance pole design

How do I apply for a residential electric service? If you availed of the services of a private electrical contractor certified . The square foot method is used during the conceptual and schematic design phase to provide a rough estimate of the service entrance based on a specific building type (office) and the square footage of the building. . Cecil, Montgomery & Prince George's Counties in . Interior: Model House . In Manila and in some places near old U.S. military bases, the service drop is two 110 load wires and a neutral. 3.1 Service Entrance and Meter Locations . Transformer primary and secondary voltages can be 2,400; 4,160; 7,200; 12,470; and 13,200 for 15-kV Class, and 120, 208, 240, 277, and 480 for 600-V Class. construction of private poles and installation of service entrance. Requirements for additional meralco meter Shopify. at the electrical service entrance or above areas or sidewalks . - service meter - service entrance 2 4 6 8 10 12 14 15 16 13 11 9 7 5 3 1 20 20 20 20 20 20 20 20 panel lp 20 20 20 20 20 20 20 20 ground terminal copperweld . Apr 2010 IV.A.1 Service Equipment - General Changed "should" to "shall" regarding accessibility of service equipment Sep 2010 connect to meralco 2 - 5.5 mm2 thw service entrance detail source 220v, 60 hz in 25 mm dia. Design analysis shall be included on the drawings or shall be submitted on separate sheets of standard size, and shall show: Branch circuits, sub-feeders, feeders, busways, and service entrance; Types, ratings, and trip settings of overload protective devices; Calculation of voltage drops. After the customer installs the service equipment, the power company installs the The service disconnecting means must be placed at a readily accessible location nearest the point of service conductor entry. facility design assessment and contract approval). 1. Rail Electric Pole. Nearest Pole of utility company (MERALCO) furnishing electrical; location of the meter as well as sizes of service entrance wires, conduits and service equipment. POWER SUPPLIER shall determine all kWh meter and service drop locations, including temporary service. facility design assessment and contract approval). The technical requirements on the service entrance may vary depending on the customer's location or structural design of its facility. For customers with overhead electrical service, the primary power comes from the utility company's power lines via a transformer mounted on the power pole. ; Service entry cable wire sizes for long runs: Detailed tables of copper or aluminum Service Entry Wire SEC cable sizes for long runs at higher ampacities entering the building's main electrical panel, and where we give sizes . consideration during design of the service entrance. Our rebuilt polemounted transformers are expertly designed . ( stranded type) for Main service entrance wire. 3.Supply of labor, tools, equipment, technical supervision, & facilitation with MERALCO for the installation of electrical system. The load break switch shall be three-pole, gang-operated, and with a highly . An overhead power connection from the utility lines to the service entrance is called the Service Drop. Service entrance drops are used to supply power to your home. DOUBLE POLE 6A 4 NO 13A S/S/O (30mA) Figure 3.2: Example 1 of a Single Phase Consumer Electrical Wiring 110 mA 2X2.5MM2 PVC/PVC 32A 32A 20A 16A LIGHT/FAN RCD IV.B.5 Installation of service entrance Prohibited condulets and junction boxes Apr 2010 Fig VI-9 Flood Elevation Elevation is inspecting authority requirement, not FPL. Requirements for pole attachment requests from companies who have taken valid Infrastructure Use. NEW JERSEY OFFICES Use the proper type of grounding rod. If you availed of the services of a private electrical contractor certified . . The overhead service conductors from the last pole or other aerial support to and including the splices, if any, connecting . construction of private poles and installation of service entrance. The strength of rail pole is maximum, so the cost is also maximum. Service Entrance and Load Side Installations Prior to Final DU Inspection . Energy Efficiency Tips Energy Calculator Government. The service drop illustrated in Figure 1 has two 120V lines and a neutral conductor. Additional services shall be permitted under any of the following: Business - Secretary's Certificate. Sa video n to ipapakita ko s inyo ang tamang pagkabit ng meter base o service entrance n png industrial at naaayon sa guidelines ng PEC at meralco at tamang. Transmission Line Standards Steel Pole Structures Aerial Patrol Mile M arker and Number Signs (Sh. Alternate locations may incur additional costs to the customer. 4.0 Commercial and Residential Services 0-200 Amps . cabinet preferred outside installation figure 20a - phi - meter installation for new construction 400amp maximum figure 20b - phi - meter placement in a flood zone (ug service) figure 20c - phi - meter placement in a flood zone (oh service) figure 21 - phi - temporary service overhead (across . Pole cap is provided in the top of the pole to avoid entrance of rainwater inside. SERVICE ENTRANCE - UNDERGROUND Single & Three Phase 200, & 320/400 Amp 10-01-18 ER 19-270-Q PAGE 3 OF 6 Note: Approved service entrance cable, with weather-proof fittings, may be used between socket and the general service disconnect, where permitted by local authority. . REQUIREMENTS. . It shall have a minimum size of 150 mm x 150 mm (6"x 6") and a smooth finish. OVERHEAD POLE MOUNTED TRANSFORMERS PADMOUNT TRANSFORMERS VAULT TYPE DT 2. service shall be metered at the secondary voltage side service entrance shall be located along the property line not more than 30 meters horizontal distance from nearest MERALCO's secondary existing facilities Otherwise, the application shall be covered by a project study for the extension of facilities. They are licensed by the Philippine Contractors Accreditation Board (PCAB) and certified by Meralco,** after meeting the technical standards, requirements and qualifications. All recommendations for conductor sizes assume a 75 EC temperature rating . Use one 110 AT, 2 pole, 240 V, molded case circuit breaker. Art. 4.1 Service Disconnect 0-200 Amps . customers should refrain from constructing the service entrance until Meralco advises the optimum location. Fig. 1. These must be a minimum of 12 feet above a driveway. (F) Design Analysis. 1 of 3) 126 . Request Letter for Service or Accomplished Application Form ( www.meralco.com.ph/apply-now) 1 Valid ID (for single proprietorship, click here for a list of accepted IDs), DTI Certificate (for non-corporations) or SEC Certificate (for corporations) *For Representatives: Authorization Letter & Additional IDs are required. There are two main types of residential electrical service in the Philippines. In most of the rest of the country you will find one 230v load and a neutral. at 40 amps; service entrance rated; 240v rated; 100 amp rated; 100k aic rated; nema 3r padlockable its service main disconnect: general duty, two-pole s/n, fusible, single throw safety switch; fused conductor (neutral) to ground in wire trough at neutral buss. Perhaps increases in capacity for the service are planned or possible so that a GFP system would be desired or required by code. (e.g. Pole Foundation Design with Spreadsheet 2012 Instructor: John W. Andrew, PE PDH Online | PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.PDHonline.org www.PDHcenter.com An Approved Continuing Education Provider. Our mission is to provide our customers the best value in energy, products and services. The customer installs everything in the pic- ture, except the meter. viii electric service handbook figure 19 - pepco - single phase, 3 wire, 120/240 volt 800 amp c.t. This service . rsc load schedule ckt nodescriptionqty load wattsamp breaker sizepole conductor & conduit size 1 2 lighting c o 10 5 1000 4600 20 at 30 at 2 2 2 - 2.0 mm2 thw in 20mm dia. Identification documents. Call our local National Grid office for useful information and assistance In secondary metering installations the voltage is lower than in primary installations. Review of the Design Requirements Title Block This is a standard strip of 40 mm height at the bottom of the sheet and contains the following: a. . Residential - ID & Proof of Valid Occupancy. Read: How to Select Proper Type of Miniature Circuit Breakers MCBs Main Feeder By inspection: Non- Continuous = 8, 960 VA or 40.72 @ 220V (conv. Step 1: The cable reel should be mounted on a reel carrier on a cable trailer or aerial line truck. 7 Self-Contained May Pole, 120/240V to 200 Amp Fig. For each step, the customer and Meralco have responsibilities to fulfill Electric Industry Publications Your Co-op . who would want Meralco to provide the streetlight for an existing Meralco pole. The first option if they are prepared by the rental property matters, application letter for authorization letter to design that enables our. All wiring after the service equipment are treated and designed as feeders, including the wiring to the individual occupant's unit. 2. Use flexible conduit for interior wiring,solid PVC from meter base to panel board ( underground), & RSC pipe from Meralco Service Entrance Cap to Meter base ( exposed) Two Units per Private Entrance Pole. . Meralco celebrates 118 years of service in 2021. Also, visit https://www.nationalgridus.com for this and other National Grid information Our assistance is just a phone call away! They can be fed overhead or underground from the utility company's power pole. . Then the reel carrier is driven along the cable route. 9.1 Electronic Equipment The Customer is responsible for the installation of surge protection on sensitive electronic equipment. 2.Supply of Low Voltage Switchgear, Automatic Transfer Switch, panelboards & wire gutters. Meralco celebrates 118 years of service in 2021. The maximum current demand calculations for each circuit must be . SERVICE DISCONNECTS AND METERING 35 . Service entrance drops are used to supply power to your home. This is per service, not per building. It can also be installed in CT cabinets or at the riser of an overhead installation. SECTION 400. Newly updated power rates when served overhead service entrance enclosure, or both lower than their economic standing, additional meralco power. You may apply for a new residential electric service through the following Meralco channels: Online www.meralco.com.ph/apply-now Call Center Hotline 16211 Business Centers (Click here for a list of the offices.) 3. A 14 mm diameter hole is to be made at 300 mm above ground level for earthing purpose. Meralco Service Entrance Design. The heavy lines that hang between the transformer and the house are collectively called the service drop. Step 2: As it advances along the route, the cable ought to be paid off the reel with no back tension on the reel, guided to the pole, and supported with appropriate hardware. Co-op will furnish dip pole Member to install first section (10') of schedule 80 conduit on pole with enough service wire hanging out to reach top of pole plus 3' for connections. Installation of Main Panel under the meter base equiped with 60A double pole circuit breaker bolt-on type, wire size is # 8AWG THHN/THWN and pipe size is 1/2" diameter with service entrance cup 1/2". INSTALL MERALCO METER BASE MAIN DISCONNECTING MEANS (MAIN CIRCUIT BREAKER/FUSIBLE LINK) 1.6 - 1.83 m INSTALL GROUND TERMINAL FOR TERMINATION OF NEUTRAL WIRE INSTALL CONDUIT FOR GROUND WIRE (PVC/RSC) USE SOLDERLESS CONNECTOR OR GROUND CLAMP GROUND WELL INSTALL GROUND ROD (8 FT.) FOR ST-5 METER BASE (1PH) FOR ST-7 METER BASE (3 PH) If ground fault indication (alarm) is provided on the generator, 4-pole transfer equipment will be necessary for proper sensing. This is the overhead service conductor from the last pole or other aerial support to and including the splices if any, connecting the service entrance conductors at the building or other structure. Residential - ID & Proof of Valid Occupancy. #2 awg copper grounding electrode conductor (common). 2. . SEC Registration or Latest General Information Sheet (GIS) 2. 5 sets of Electrical Plan With sign and Seal of PEE and . 01 8000 Rev. Grain Bin Restrictions Height Requirements for Overhead Lines Call 811 Before You Dig. They can be fed overhead or underground from the utility company's power pole. outlet & range load) Total Loads = 19, 923 VA Main Feeder Current = (45.29 x 100% ) + (40.72 x 125%) = 96.19 Amperes [4] Use 50 sqmm TW cable as main feeder or service entrance wire Diversity factors may be taken into account. (1) Multiple-occupancy buildings where there is no available space for service equipment accessible to all occupants (2) A single building or other structure sufficiently large to make two or more services necessary (c) Capacity Requirements. 1.3- Electrical Plans and Specifications PEC 2009 Edition (F) Design Analysis Design analysis shall be included on the drawings or shall be submitted on separate sheets of standard size, and shall show: (1) Branch circuits, subfeeders, feeders, busways, and service entrance; (F) Design Analysis (2) Types, rating, and trip setting of . Minimum vertical clearance of an overhead service drop measured from the ground, at the electrical service entrance or above areas or sidewalks accesible only to pedestrian lanes, measure from final grade line or other accesible surface only for service drop cabled together with a grounded bare messenger wire and limited to 300 volts to ground For distribution structures (35 kV and less), typical spacings range from about 75-100m. Answer (1 of 4): The spacing distance between transmission structures varies based on a number of factors. The applicable contracted capacity of letters and schedule along with an installation so go into service. 31 2051 Rev. From there, the transformer feeds two hot wires and a neutral to the service drop . MANILA AND CITIES: Three wire 120/240V Systems . The total gross floor area should include all supporting functions such as kitchens used by staff, laboratories, lobbies, atria, conference rooms and auditoria, fitness areas for staff, storage areas, stairways, elevator shafts, etc. Date Started: December, 2010. We also offer technical support to the electrical distribution industry, as well as repair, recycling, and disposal of transformers and regulators. In either case, a hot primary feed and a neutral feed are run from the utility company's line to their transformer. Electrical Safety Foundation International Electrical Safety.org Powering Your Safety. concerning electrical wiring in their service area. Services Offered Complete Bundle End-to-end processing of service application, from submission of documents to construction of service entrance. For pdf file you can download it here: Guide for the Design and Installation of Services. Generator Safety Wiring Permits & National Safety Council Kids and Teachers. Figure 2-5 shows details of a service mast, with the meter on the surface of the building. #2 awg copper grounding electrode conductor (common). description load il @ 80% d.f. Service entrance, feeder, subfeeder, . Format of Presentation: 1. . service entrance requirement Comment on Construction Drawings Project Covered Application Submission of construction drawings Conform with Service Entrance Location 6 major steps before energization. Service Entrance Meter Pole Meter pole shall be 18' minimum (Not to exceed 25') round class 7 creosote or penta treated pole with a minimum 4" diameter top _________Point of attachment If necessary, anchor and guy wire will be * installed by BTU. Sunbelt Solomon specializes in the sales and service of oil-filled transformers and distribution transformers. From there, the transformer feeds two hot wires and a neutral to the service drop . REQUIREMENTS. of the P.E.C, the national building code, municipal or city ordinances, office of the municipal or city electrician, & Meralco. Re: Philippine 230/240V Two Wire System to 110/120V U.S. 09/24/2013 6:54 AM. 4.2 Meter Socket and Metering 0-200 Amps. at 40 amps; service entrance rated; 240v rated; 100 amp rated; 100k aic rated; nema 3r padlockable its service main disconnect: general duty, two-pole s/n, fusible, single throw safety switch; fused conductor (neutral) to ground in wire trough at neutral buss. Co-op will install remainder of member provided conduit, straps and weatherhead up the pole and make connections. Service Application Where do I apply for a residential electric service? When service entrance cable is used, a watertight connector must be used at the top of the meter base and disconnect switch, and a non-watertight connector may be used at the bottom of both. Easily fill meralco application letter authorizing . The service-entrance conductors is between the service point and the service equipment to the high rise building. Figure 1: A service Drop. 1.1Service Entrance panel For 120 / 240 VAC Split phase AC power Distribution Refer to page 35 for service drop attachment clearance to ground. B - Substation Standards Service Building Structural Building Entry Platforms . 54. 800.830.0251. B. They specialize in constructing the required service entrance and in acquiring the Certificate of Final Electrical Inspection (CFEI) from your local government so your home can be energized by Meralco. In Manila, Iloilo City and other large Philippine cities, residences are supplied with 240 volt, alternating current, 60 cycle power. 31 0001-1 Rev. By the way this set-up is good but not always required by meralco or other service utility provider this set-up required if ur occupancy is 15 meters away from service utility or private pole. . Design for meralco can pay for work at twe used by meralco padlock is used . Notes to the table above. Depending on the utility PTs may be optional on voltages over 120v. meralco avenue, pasig city republic of the philippines i r k They supply the required incoming electrical service to the buildings. C. ON-SITE HEALTH PERMITS: See Section 1-6 through 1-8 relating to on-site Our mission is to provide our customers the best value in energy, products and services. Identification documents. 8 Customer Owned Pole for Non-Fixed Premise Fig. Authorization Letter For Meralco Application. They can assist in the acquisition of permits and certificates needed for electric service, construct private poles and install service entrance. . Type of . This power enters the building / structure / house through the Service Entrance Panel for further internal distribution. normally supplies through one service (Note: Meralco services 1-phase request up to 75 kva transformer capacity.) Is the arrangement of service-entrance and service equipment being considered permitted by the Code? bond the service grounded of 4-pole transfer equipment may be neglible given the cost of future retrofit. Business - Secretary's Certificate. For transmission structures (greater than 100 kV), the spacings range from about 150 to over 300m, w. . . Service Entrance Size The following tables summarize three different methods to calculate the size of the service entrance. Any excess electricity generated cannot be exported to Meralco. b) Legend or Symbols (Refer to Appendix A-Electrical General Electrical System requirements for Commercial buildings: The fundamental objective of commercial . With the glorious design of this house you will be amaze and daze. You can have a maximum of six service disconnects for each service permitted by 230.2, or each set of service entrance conductors permitted by 230.40 Ex 1, 3, 4, or 5 [230.71]. . Customers with Zero Export use the electricity generated by their RE facility for their own consumption. a utility pole (feeds through overhead lines) or on the ground on a concrete pad (Pad mounted, feeding through underground lines). "Standard frequency of power supplied by the local power utility company like Meralco." Service Drop "The overhead service conductors from the last pole or other aerial support to and including splices, if any, connecting to the service entrance conductors at the building." . Main Service Disconnect . Poles Designed with Provisions for Cables of other Utilities A service entrance pole may be used to carry the service entrance of a customer-owned communication cable. Trench and conductor provided and installed by . For each step, the customer and Meralco have responsibilities to fulfill Initial Requirements Service Application can already proceed even with the initial submission of the following three important requirements: 1. The three lines may be independent conductors or housed in a three conductor cable called a triplex cable (As shown in the figure). We would like to show you a description here but the site won't allow us. There are two types of distribution systems in the Philippines. volt pole at no. . Fig. hindi talaga ako. Electricity Board demanded penalty from consumer for committing theft of electricity by providing bolt under the CT Chamber before the meter. (e.g. Photocopy of PTR/PRC of Design and In-Charge Electrieal Engineer 3. upvc 4.35 20 computations : Contact Us. Branch circuit wire sizes for long runs: The long-run wire sizes given in the table above are for typical residential branch circuits up to 50A. Any excess electricity generated cannot be exported to Meralco. SERVICE ENTRANCE APPROVES CONSTRUCTION DRAWINGS ISSUANCE OF METERBASE IF APPLICABLE PREPARES DESIGN AND ACTUAL PROJECT COST DETERMINES VIABILITY FOR PROJECT COST WAIVING SECURE RIGHT -OF WAY PERMIT (TIMELINE FOR SECURING ROW GREATLY DEPENDS ON THE GRANTOR OF ROW) PRE-SURVEY AND PROCESSING SURVEYS AND ADVISES CUSTOMER ON SERVICE ENTRANCE UNDERGROUND PADMOUNT TRANSFORMERS In either case, a hot primary feed and a neutral feed are run from the utility company's line to their transformer. = x 80% x 1.25 = circuit breaker 230 v feeder: . The service could be wired to an exterior meter as shown here, or to service equipment inside the building. Secondary metering is installed on the secondary outputs of both overhead and underground transformers. MERALCO Standards: Electrical Design Electrical Design Standards SERVICE VOLTAGES SECONDARY METERED - 240 V, 400 V, 460 V PRIMARY METERING -34.5 kV, 13.8 kV (portions of Cavite & Bulacan), 115 kV (Subtransmission) FACILITIES 1. Transformers are located either outdoors or inside buildings in an electrical room or other areas as permitted by code. 4.3 Residential and Commercial Services 201 TO 400 Amps . upvc 2 - 3.5 mm2 thw in 20mm dia. 4. The pole shall be fully treated and the pole backfill must be thoroughly tamped the full depth (see table below). NEW BUSINESS ADDRESSES AND PHONE NUMBERS. Help is as close as your phone. . bond the service grounded Electrical Plan and Load Schedule 3. 9 Temporary Service Entrance, Tripod Mounted . The safety factor of the pole 2.5 and the weight of steel 7.85 gram per square cm are taken. Revised June 2018 i Call Before You Dig. CONSTRUCTION STANDARD DRAWINGS DIVISION 15 . The National Electrical Code on Service Entrance provides that: " Service entrance shall have sufficient ampacity to carry the building load.They shall have the adequate mechanical strength and shall not be smaller than 8.0 mm 2 or 3.2 mm diameter except for installation to supply limited load of a single branch circuit such as small poly-phase power, controlled water heaters and the like . . Headquarters 19600 State Highway 59 Summerdale, AL 36580 8:00 A.M. to 4:30 P.M. M-F Get Directions Delivery Address: 19646 State Highway 59 Summerdale, AL 36580 B - Design Standards Unified Soil Classification 5. Customers with Zero Export use the electricity generated by their RE facility for their own consumption. Voltage / Overhead For RME Forum -November 28, 2014 IIEE Convention Presented by : Ray Anthony Rodriguez Team Leader-Meralco South CBG Technical Support. Metering for Services 201 - 400 Amps More than 30 meters horizontal distance from nearest MERALCO's secondary existing facilities. reliable design within the permitted voltage drop limits. 1.Design of electrical system. When a pole taller than 30 feet is used .

meralco service entrance pole design